I finally finished with the left door frame today. Got it lined up and temporarily installed on the hinge. The alignment is almost identical to the right door. I'm happy with it. Next up is the window frames that insert into the upper part of the door.
I also picked up the exhaust piece I had welded up that bolts on the back of the turbo. Previously, Rich welded the O2 Sensor bung in place but just tacked the tube to verify orientation. He finished up the welding today, inside and out. Looks beautiful. It's temporarily mounted now so Chris can run the wiring for it tomorrow.