I started positioning some of the parts that will go on the engine. The first one was the oil tank. A couple of Adel Clamps at the top, looks like I'll need to figure out how to attach one at the bottom for extra support.
Next I wanted to mount the Saber Manufacturing Prop Spacer and the NR Prop Hub. I quickly realized that something was wrong when the prop hub didn't fit on the spacer correctly. So, after asking a trusted agent (Chris Wallen) what he thought, it turns out I need a little machining done on the prop hub. The NR prop hub center hole is 1.85" and the flange on the Saber Manufacturing spacer is 2.25". All the lugs line up perfectly. I dropped it off today at the machinist.
After machining it should look something like this (Photos - Chris Wallen)...