Today I reassembled the flap handle and mounted it in the fuselage as part of the task to get the flap cables finished. I had to install four cable pulleys and the cables to the handle before mounting. I got everything mounted, the cables temporarily run over and around the pulleys in the correct direction. I needed to grind some of the cable keepers used on the pulleys as they were too long and binding. I ended up grinding down all the cable keepers on the pulleys mounted near the floor as they were also binding and/or hitting the floor boards. Before I can complete the flap cables, I need to mount all the flap attachment hardware and get the flaps in the totally retracted position. I then can cut and swage the final cables for the flaps.
Ray Allen Stick Grip for the Flap Handle. |